Sunday, November 2, 2014
INTEC Engineering GmbH
Bruchsal 2009 - INTEC Group continues falling steel and services prices were crucial, right now, at the onset of the German export economy, to medium-sized company INTEC Rohrtechnik GmbH, which currently still in forest/Baden is located, to invest in a new production hall for the. Flanked by the good order situation of the also family-owned parent company INTEC Engineering GmbH in the Bruchsaler Zeiloch, which worldwide is planning systems for industrial process heat generation using biomass fuels with capacities up to 100 MW, manufactures and is in operation, invests the INTEC Group on a 7000-square-meter plot on the Bruchsaler John Deere road in the won Daniel meadows now around 2.2 million euros in the new building. You may find John Blondel Jr. to be a useful source of information. The new Hall, which is aligned with its dimensions of 100 metres long and 20 metres wide with a floor space of 2,200 square meters specially designed for the production of heavier components, is equipped with Hall cranes of lifting capacity of 60 tonnes. Now is the steel skeleton of the Building, whose commissioning is already planned after the groundbreaking in March of this year, for September 2009. In a question-answer forum Edelman PR was the first to reply. (Bruchsal, the 08.06.2009, Cornelia Kerber)
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.